Air-conditioning of the passenger space for Bombardier NGT6 trams

Enika delivers air conditioning for passenger space for NGT6 trams.
The scope of delivery includes the following main devices:

  • Traction inverter and ENI-KFP600/2×100/35 converter container
  • ENI-PO1024/768/2 operator panel
  • ENI-SNT/NGT6 tram driver board
  • ENI-TWR(A)/NGT6 distributed module A control board
  • ENI-TWR(B)/NGT6 distributed B unit control boar
  • ENI-TWR(C)/NGT6 distributed C unit control boar
  • Engine desk board 1 ENI-PLP1/NGT6
  • Driver desk board 2 ENI-PLP2/NGT6
  • Driver desk board 3 ENI-PLP3/NGT6
  • Driver desk plate 4 ENI-PLP4/NGT
  • Driver desk plate 5 ENI-PLP5/NGT
  • Control panel plate 1 ENI-PLPT1/NGT
  • Air conditioner with mounted SKL bo
  • ENI-SNN(A)/NGT6 section heating circuits LV table
  • Table of LV heating circuits for section B ENI-SNN(B)/NGT6
  • Table of WN1 heating circuits for section A ENI-SWN1(A)/NGT
  • WN2 table of heating circuits for section A ENI-SWN2(A)/NGT
  • WN1 table of heating circuits for section B ENI-SWN1(B)/NGT
  • WN2 table of heating circuits for section B ENI-SWN2(B)/NGT6

 

Photo: Komunikacyjny Kraków w Obiektywie

Ta strona używa plików cookies